Interface Contracts Ltd
Industrial electrical contractors ,specialists in clean and wastewater projects, biomass plants and waste to energy projects. Providing a complete 3D design, project management, supervision and full installation service. Interface’s industry acknowledged design and installation skills enables the company to meet the individual requirements of any client.
The Interface design package includes:
- BIM and 3D modelling.
- Power & control cables to all drives and instruments.
- Cabling to control stations and emergency stops.
- Main, equipotential and supplementary earth bonding.
- Telemetry and fibre optic networks.
- Supply and cable from generator connection units and sub-stations.
- High voltage cabling.
- Profibus cabling.
- Trace heating supplies.
- Supply & install cable, junction boxes, isolators, free issue instruments.
- Installation of building services to new and existing buildings.
- Structural lightning protection.
Interface sets itself apart from the competition in the time and expertise it dedicates to up front design – so eliminating potential on-site issues before installation begins. It is these design skills that subsequently enable its installation teams to move seamlessly from drawings to the on-site stage and provide the basis for a safety record that is second to none in the industry.
The company’s design team offers a complete electrical design which can include 3D when required:
- Cable calculations & schedules.
- Site lighting, layout and lighting calculations.
- Block cable diagrams.
- Building services layouts and single line diagrams.
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Knostrop Sludge Treatment Facility (2019)
Over the last two decades the concept of municipal sewage being an expensive to treat waste stream has slowly become surpassed by renewable and sustainable opportunities that re-label wastewater treatment works as water resource recovery facilities (WRRF), sludge recycling centres (SRC) or sludge treatment facilities (STF) to name but a few. Incentivised by UK Government, […]
Renewable Energy
Wastewater Treatment and Sewerage
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Knostrop Sludge Treatment Facility (2018)
The Yorkshire Water sewage sludge incinerator at Knostrop WwTW is approaching the end of its asset life in AMP7. This, along with high operating costs has driven a business need to review the long-term treatment of sludges in the Yorkshire/Leeds catchment. Following a strategy review, Yorkshire Water Services (YWS) decided to progress with conventional mesophilic […]
Renewable Energy
Wastewater Treatment and Sewerage
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/taxonomy.php on line 3720
Warning: Array to string conversion in /var/www/wp-wpodev/wp-includes/category-template.php on line 1301
