Howden Mini Hydro Electric Project (2017)
Howden Reservoir is the first of three reservoirs owned by Severn Trent Water in the Upper Derwent Valley. The reservoir is bounded at its southern end by Howden Dam which impounds the River Derwent and overflows to Derwent Reservoir which in turn overflows to Ladybower Reservoir. Work commenced on the dam’s construction on 16 July […]